X
Method Statement / Risk Assessment

With the increased concerns over Health and Safety and the requirements of LOLER 1998 it is important to carry out both a Risk Assessment and produce a Method Statement for every lifting operation.
This allows the crane supervisor or you the customer to assess in advance any risk that may be encountered and produce a safe method by which the lifting operation will be conducted.

